






Project Description
Lovett Mechanical was contracted to install process piping with optional dehumidification to Nirvana’s Injection molding machine, a machine for manufacturing plastic products by the injection molding process, successfully ensuring efficient machine functionality.
Specifically, the Husky Hycap 225-RS55. This was completed in 3 phases.
The Lovett Mechanical team was able to have minimal impact on Nirvana’s operations due to systematic and methodical coordination with the Nirvana Bottled Water staff.